This is quite slow, at least for part 2 (and part 1 is slower than I want it to be, event parse takes longer than I thought it should). I need a better approach to the second part. Probably need to mark all nodes' distances from the goal point instead of one-by-one plotting a path from each possible start to the end, but that requires an adjustment to how I'm building the graph in the first place.